Airflow: 250~500 m³/h
Model: TFWC A1 Series
• Use heat pump hot/cold water heating/cooling to condition incoming air for energy recovery ventilation
• Smart defrost mode
• With bypass function
• Provide RS485 communication interface
• WiFi module, APP control
DC motor:Higher Energy Efficiency and Ecology by Powerful Motors
Washable exchange core: The modified membrane which can wash the enthalpy exchange core and has a long life of 3-10 years
Energy recovery ventilation technology:The heat recovery efficiency can reach more than 70%
Smarter control:APP+Intelligent controller
G4+H12 filter)*2 More cleaner fresh air
Countercurrent cross enthalpy exchange core, higher heat exchange efficiency
What about the water coil ERV heating effect?
Let's look at a set of experimental data
|
Preheating coil load calculation (inquire standard Yinchuan in China atmospheric pressure value: 88390pa) |
|||||||
| Wind speed | Coil inlet Temperature (℃) /relative humidity (%) |
Inlet enthalpy of coil (KJ/KG) |
Coil inlet Temperature (℃) /relative humidity (%) |
Inlet enthalpy of coil (KJ/KG) |
Airflow (m³/h) |
Air density (kg/m³) |
Preheating load (W) |
| High | 1.93/43.01 | 7.2 | 20.40/13.78 | 26.5 | 300 | 1.117 | 1797 |
| Mid | 1.93/43.01 | 7.2 | 21.77/13.34 | 28.3 | 250 | 1.117 | 1637 |
| Low | 1.93/43.01 | 7.2 | 23.17/10.76 | 28.9 | 200 | 1.117 | 1347 |
1, test site coil water inlet temperature: 32.3℃, outlet temperature: 22.1℃;
2. According to the enthalpy difference of the inlet and outlet air of the coil, the heat load of the coil is calculated.
3. Inquire the standard Yinchuan atmospheric pressure value: 88390pa
When the municipal hot water heating is not lower than 30℃, the preheating capacity of the three-pipe energy recovery ventilation system (with preheating coil) at high/medium/low speed is:
High speed 1797W, medium speed 1637W, low speed 1347W
This energy recovery ventilation design helps meet the preheating requirements of fresh air.
Water coil energy recovery ventilation (ERV) installation schematic
1: Heat pump air conditioning external unit
2: Floor heating
3: Water tank
4: Energy recovery ventilation (ERV) controller
5: Heat pump energy recovery ventilation (ERV)
The installation location is only for reference. Perform the installation according to the design diagram
|
Model |
Rated Airflow (m³/h) |
Rated E.S.P(Pa) |
Temp.Eff. (%) |
Noise (dB(A)) |
Purification efficiency |
Volt. (V/Hz) |
Power input (W) |
Heating/cooling calorie (W)
|
N.W(Kg) |
Size(mm) |
Control form |
Connect Size |
| TFWC-025 (A1-1D2) |
250 | 100(200) | 75-80 | 35 | 99% | 210-240/50 | 100(300*2) | 500~1500 | 58 | 1200*780*260 | Intelligent control/APP | φ150 |
| TFWC-035 (A1-1D2) |
350 | 100(200) | 75-80 | 37 | 210-240/50 | 130(300*2) | 500~1500 | 58 | 1200*780*260 | φ150 | ||
| TFWC-500 (A1-1D2) |
500 | 100 | 75-80 | 40 | 210-240/50 | 220(300*2) | 500~1500 | 58 | 1200*780*260 | φ200 |
IGUICOO, established in 2013, is a professional company focus on the research development, sale and service of ventilation system. We are committed to improving air cleanliness, oxygen content, temperature, and humidity. In order to better ensure product quality, we have obtained I S O 9 0 0 1, I S O 4 0 0 1, I S O 4 5 0 0 1 and over 80 patent certificates.
IGUICOO has always taken technological innovation as the driving force of enterprise growth and opening-up cooperation. At present, we have a senior research and development team with more than 20 high-educated people. We always insist on providing customers with innovative technical solutions, and win the trust of customers with professional services, high-quality products, and competitive prices.